Belyuen Airstrip Gravel Pavement Upgrade

Belyuen Airstrip Gravel Pavement Upgrade



Project Client

Department of Logistics and Infrastructure

Status

Completed

Scope of work:

The Belyuen Airstrip Gravel Pavement Upgrade aimed to modernise the airstrip's infrastructure to improve safety, functionality, and compliance with Civil Aviation Safety Authority (CASA), Manual of Standards (MOS) and Airport Association standards. The project focused on resheeting and reshaping the existing gravel runway, taxiway, and apron to address issues such as shrinkage holes and uneven surfaces. The project also included designing and upgrading a sealed access road connecting the airstrip to Cox Peninsula Road, ensuring reliable connectivity.

Our Role:

Byrne Consultants were engaged to undertake the following scope of work:

  • Conducted detailed site inspections to assess existing conditions and ensure alignment with project objectives.
  • Coordinated with surveyor to perform a precise ground survey, critical for geometric and pavement design.
  • Managed geotechnical assessments to evaluate subsurface conditions, supporting durable pavement designs.
  • Delivered detailed designs for: o Gravel pavement resheeting and reshaping for the runway, taxiway, and apron.
    • Sealed access road, incorporating a 3.5m-wide two-lane configuration and line marking.
    • Stormwater drainage solutions to improve surface water management.
    • Compliance with CASA standards and operational safety requirements.
  • Conducted a road safety audit and implemented design adjustments to meet regulatory and operational safety standards.
  • Produced required tender documentation, including drawings, technical specifications, and cost estimates.
  • Engaged with DLI to ensure compliance with standards and successful project delivery.
  • Facilitated value engineering workshops to identify cost-saving opportunities while maintaining design integrity.

Project Outcomes:

Byrne Consultants delivered a comprehensive design that balanced technical requirements, stakeholder priorities, and budgetary constraints. The collaborative approach ensured the project met all safety and operational standards while remaining sensitive to environmental and cultural considerations. This achievement highlights our expertise in delivering high quality infrastructure solutions that exceed client and community expectations.


Other Projects

NT Remote Housing Program - Subdivisions

NT Remote Housing Program - Subdivisions

Byrne Consultants was engaged by the Department of Logistics and Infrastructure (DLI) to support the delivery of remote housing across the Northern Territory. Our role included community master planning for new subdivisions, community engagement, and the design and development of residential infrastructure to support sustainable growth in remote communities.

NT Remote Housing Program - Community Master Planning

NT Remote Housing Program - Community Master Planning

Byrne Consultants was engaged by the Department of Logistics and Infrastructure (DLI) to support the delivery of remote housing across the Northern Territory. Our role included community master planning for new subdivisions, community engagement, and the design and development of residential infrastructure to support sustainable growth in remote communities.

NT Subdivision Development Guidelines

NT Subdivision Development Guidelines

The NT Subdivision Development Guidelines are a Northern Territory Government initiative to consolidate and standardise subdivision design and construction requirements across all localities within the Northern Territory.

NT Remote Infill Land Servicing Program - Site Servicing Plans

NT Remote Infill Land Servicing Program - Site Servicing Plans

Brownfield housing developments require site servicing plans to detail utility connections to the lot and for civil set out. This project involves the design and documentation of site servicing and civil layout plans for remote infill lot developments across the Northern Territory to support the Remote Housing Program.

Darwin.

(08) 8947 2476
info@byrneconsultants.com.au
T8, Ground Floor, 60 Winnellie Road,
Winnellie NT 0820

Sunshine Coast.

07 5329 4507
info@byrneconsultants.com.au
Building 1, 30 Chancellor Village Boulevard,
Sippy Downs QLD 4556

Gold Coast.

(07) 5628 2794
info@byrneconsultants.com.au
Shop 6001, 19 Robina Town Centre Drive,
Robina QLD 4226


Let's Talk.