We developed layouts for DCI approval, followed by Design and Documentation of the $2.3M roundabout and road realignment and $1.5M Park and Ride facility. Scope included roadworks, storm water drainage, traffic signals, electrical reticulation, street lighting and miscellaneous service relocations. Byrne Consultants also provided the Dept. of Infrastructure project manager with assistance and advice for the duration of the construction phase.
The Coolalinga Park and Ride facility was commissioned three weeks before the Christmas break. The client required the civil works to be completed two weeks after the break. Byrne Consultants undertook the development of layouts for approval and followed up with detailed design and documentation, completing the civil works within the required time frame.