Palmerston Boulevard Stage 2

Palmerston Boulevard Stage 2



Project Client

City of Palmerston

Project Budget

$6 million

Status

2015/16

Scope of work:

Concept development followed by detailed design of the Palmerston Boulevard reconstruction. The project required the removal of two large multi lane roundabouts, signalising the Chung Wah intersection, regrading and reconstruction of the carriage way and verges to develop an environment suitable for an enhanced inner city experience, conducive to alfresco dinning, accessing the Goyder Square and focused on pedestrian accessibility within the CBD.

Project Highlights:

A notable feature of this design was the need to match into existing buildings and facilities while maintaining disabled access throughout the boulevard. The project required relocating and protection of many services and the reconstruction and upgrading of the stormwater drainage to suit the new design levels.


Other Projects

The Belyuen Airstrip Gravel Pavement Upgrade aimed to modernise the airstrip's infrastructure to improve safety, functionality, and compliance with Civil Aviation Safety Authority (CASA), Manual of Standards (MOS) and Airport Association standards.

Darwin.

(08) 8947 2476
info@byrneconsultants.com.au
T8, Ground Floor, 60 Winnellie Road,
Winnellie NT 0820

Sunshine Coast.

07 5329 4507
info@byrneconsultants.com.au
Building 1, 30 Chancellor Village Boulevard,
Sippy Downs QLD 4556

Gold Coast.

(07) 5628 2794
info@byrneconsultants.com.au
Shop 6001, 19 Robina Town Centre Drive,
Robina QLD 4226


Let's Talk.